Welcome to the company ! we have many years of professional experience !
rsdgj@pyzyrsd.com +86 513525609655

Small desander

Established in 2001, Puyang Zhong Yuan Restar Petroleum Equipment Co.,Ltd, “RSD” for short, is Henan’s high-tech enterprise with intellectual property advantages and independent legal person qualification. With registered capital of RMB 50 million, the Company has two subsidiaries-Henan Restar Separation Equipment Technology Co., Ltd We are mainly specialized in R&D, production and service of various intelligent separation and control systems in oil&gas drilling,engineering environmental protection and mining industries.We always take the lead in Chinese market shares of drilling fluid shale shaker for many years. Our products have been exported more than 20 countries and always extensively praised by customers. We are Class I network supplier of Sinopec,CNPC and CNOOC and registered supplier of ONGC, OIL India,KOC. High quality and international standard products make us gain many Large-scale drilling fluids recycling systems for Saudi Aramco and Gazprom projects.

Certificate of Honor

CONTACT US

Customer satisfaction is our first goal!

Phone

+86 513525609655

E-Mail

rsdgj@pyzyrsd.com

Address

Road West, North Branch, Jingkai Road, Puyang City

Small desander
Best Exploration Geological Supplies Australia-Wide ...
Best Exploration Geological Supplies Australia-Wide ...

Buy Direct. Manufacturer of Geological Field Supplies & Equipment. Specialists in the latest Geo Equipment. Australian-wide locations in Perth, Brisbane, Kalgoorlie, Mt Isa, NSW, Adelaide.

B2Gold Corp. - Exhibit 99.1 - Filed by newsfilecorp.com
B2Gold Corp. - Exhibit 99.1 - Filed by newsfilecorp.com

11/2/2014, · The ,largest, is the Gramalote Central pit. The smaller, ... a one-meter piece of four-inch PVC ,pipe, was inserted into the top of the hole and cemented into place to record the drillhole location and general orientation. ... the statistics and variography of this domain would be ,well, supported by closely spaced infill ,drilling, as ,well,.

DOI: 10.17148/IARJSET.2021.8105 Agriculture 4.0: Building ...
DOI: 10.17148/IARJSET.2021.8105 Agriculture 4.0: Building ...

on the shelves, using a 6-diameter drill and then ,drilling, 2-3 holes in the ,pipe, so that when the water is pumped up, it will irrigate the vegetable pots. Step 3: Install the drain down - Install a drain line in each pot: Use a 20-diameter drill to make a circular hole at the bottom of each pot, install a pair

Advances in Hydraulics and Water Engineering
Advances in Hydraulics and Water Engineering

Preview Abstract. We have analyzed the water of all tubewells used for drinking in Samta village in the Jessor district, Bangladesh since 1997. The following fact has been confirmed from the survey. The tubewells with arsenic concentrations exceeding the limit …

Earthwork - SlideShare
Earthwork - SlideShare

2.19.2 Width of Trench(a) Upto one metre depth the authorized width of trench forexcavation shall be arrived at by adding 25 cm to the externaldiameter of ,pipe, (not socket/ collar) cable, conduit etc. Wherea ,pipe, is laid on concrete bed/ cushioning layer, theauthorized width shall be the external diameter of ,pipe, (notsocket/ collar) plus 25 cm or the width of concrete bed/cushioning layer whichever is more.(b) For …

La Yuca ecoladrillo schoolroom 2011 - Appropedia: The ...
La Yuca ecoladrillo schoolroom 2011 - Appropedia: The ...

The wires were spaced every ,20cm, running up and down the column along two lines, 8cm apart (Fig 8). We chose the 8cm spacing because it was the size of our ,largest, diameter bottle, and we wanted the chicken wire to fit snugly. This method actually turned out ,well,, and we were able to attach the chicken wire easily and pull it relatively tight.

ESTIMATED COST: Rs
ESTIMATED COST: Rs

The ,pump, and engine shall be assembled in the ,pump, manufacturers works and certified by them for performance : Horizontally mounted multistage centrifugal end suction ,pump, capable for delivery of 2280 LPM against a total head of 70 meters while running 1 Set at 1800 r.p.m. at 90 BHP complete having tail pieces for proper connection to suction & delivery line, having a name plate indicating suction stages, …

NCERT Physics Question Paper (Class - 11) | CBSE EXAM ...
NCERT Physics Question Paper (Class - 11) | CBSE EXAM ...

(a) When a ,pump, removes some of the gas, the manometer reads as in Fig. 10.25 (b) The liquid used in the manometers is mercury and the atmospheric pressure is 76 cm of mercury. (a) Give the absolute and gauge pressure of the gas in the enclosure for cases (a) and (b), in units of cm of mercury.

Mechanical Engineering Archive | March 27 2017 | Chegg.com
Mechanical Engineering Archive | March 27 2017 | Chegg.com

2) The outlet pressure (at 20 of the 6-in diameter, 1500 ft long, plastic ,pipe, fed from the water tower must be at least 60 psi for a flow rate of 1 ft/s. There are 8 90o anged elbows and one ,well,-rou

Quandaries & Queries at Math Central
Quandaries & Queries at Math Central

A ball of diameter ,20cm, rests in a conical container whose angle with the slant height and the vertical axis is 25degrees. if water is poured into the container just enough to touch the bottom of the ball, find the quantity of water in the container.

Chat Online Inquiry Email

Business cooperation

+86 513525609655

Company address

Road West, North Branch, Jingkai Road, Puyang City